Project Tittle: PROVISION OF PROJECT MANAGEMENT AND QUALITY ASSURANCE & QUALITY CONTROL (QAQC) SERVICES FOR EPCIC OF 1X45 MMSCFD HIGH PRESSURE GAS COMPRESSOR PACKAGE AT OREDO FLOWSTATION 3 (FST 3) IN OML 111
Location: OML 111 FLOWSTATION 3 (FST 3) OREDO
Clients: NIGERIA PETROLEUM DEVELOPMENT COMPANY (NPDC)

Ken-Next was contracted to provide Project Management and Quality Assurance & Quality Control services for engineering, procurement, construction, installation and commissioning of 1x45MMSCFD high pressure gas compressor package at Flowstation 3 (FST 3) OML 111 Oredo
Project Scope Provided by KEN-NEXT included
• Mobilisation/demobilisation of Personnel and equipment
• Provision of Daily, weekly and monthly report
• Provision of Interface Management
• Deployed personnel for Engineering reviews and Checks
• HAZID & HAZOP in accordance with client project mandate
• Review of vendors
• Review of Project deliverables
• Provision of rotating equipment inspectors
• Provision of E&I Inspectors
• Provision of Inspectors for Mechanical and piping construction work
• Provision of Inspectors for Civil works
• Provision of Inspector for integrity test
• Preformed Quality control check during Pre-commissioning
• Review of As Built Documentations
• Participate in all pre-commissioning and commissioning exercise.

PROGRESS PICTURES OF INSTALLATION OF REINFORCEMENT PAVEMENT BAYS WORKS SURROUNDING THE COMPRESSOR

Pavement bay concrete

View of the Compressing Unit

Three Pavement bay concreted

Three reinforced slabs surrounding the compressor ready to receive concrete.

Pavement slab works ongoing at te compressor site

Alignment of pipes/flanges

Alignment of fabricated pipes

View of the compressor

Fixing of reinforcement bars

Casting of concrete.

Batching of concrete

Checking the concrete slump (Slump test).

Laying base polythene material

Installation of rebar and concreted pavement slab around the compressor foundation.

Concrete mixer

PROGRESS PICTURES OF WELDING OF PIPE ACTIVITIES (ONGOING)

Welded joints

Welding Inspector taking the preheat temperature

3’ Pipes being weld

Joints preheating before weld

Fittings and welding operations

Inspection of compressor unit at OEM Facility 

Scroll to Top